Renton, Washington – The first Boeing Next-Generation 737 to be built at the increased rate of 42 airplanes per month rolled out of the factory in Renton, Wash. yesterday. The 737-800 will soon be delivered to Air Berlin and ultimately leased to Transavia France.
The airplane will now undergo functional, systems, and flight testing over the next three weeks before being delivered.
Market demand remains strong for the Next-Generation 737 commercial jetliner. Since 2010, production has risen about 33%, from 31.5 to 42 airplanes a month. As previously announced, the production rate is scheduled to increase to 47 airplanes a month in 2017.
Source: Boeing
Latest from Aerospace Manufacturing and Design
- Pivotal achieves AS9100D certification
- CMMs for large-scale, heavy-duty measurement
- #80 Manufacturing Matters - Machining Strategies to Save Time and Improve your Process for MedTech Components with Kennametal Inc.
- Experts discuss the latest in toolholding technology
- Forecasting the year ahead in design and manufacturing
- GE Aerospace, Lockheed Martin demonstrate rotating detonation ramjet
- Stainless steel quick release ball lock pins
- Toray Advanced Composites, partners win JEC Innovation Award for Circularity & Recycling