Auburn, Washington – Boeing has started production of the first 737 MAX fuselage stringers at Boeing Fabrication Integrated AeroStructures in Auburn, Wash. Stringers run the length of the fuselage structure giving it stability and strength.
After forming, Boeing will send the stringers to Spirit Aerosystems in Wichita, Kansas, for incorporation into the first 737 MAX fuselage. From there the fuselage will be shipped to Boeing's Renton, Wash. facility where Boeing employees will build the 737 MAX. The program is on track to begin final assembly of the first 737 MAX in 2015. The airplane will be part of the flight test fleet and is scheduled to fly in 2016.
The 737 MAX incorporates the latest technology CFM International LEAP-1B engines, Advanced Technology winglets, and other improvements to deliver high efficiency, reliability, and passenger comfort in the single-aisle market. The 737 MAX are expected to be 14% more fuel-efficient than today's most efficient Next-Generation 737s and 20% better than the original Next-Generation 737s when they first entered service.
Source: Boeing
Latest from Aerospace Manufacturing and Design
- OMA and NIMS partner to launch semiconductor technician credentials
- Analysis, trends, and forecasts for the future of additive manufacturing
- BlueForge Alliance Webinar Series Part III: Integrate Nationally, Catalyze Locally
- Blaser Swisslube, NIDEC Machine Tool America partner
- Extrusion crosshead combines concentricity adjustment, fastener-free assembly
- Vertical Aerospace unveils Valo eVTOL aircraft
- 3xD pilot step drill
- #56 Lunch + Learn Podcast with Techman Robot + AMET Inc.