AF-7, the second F-35 Lightning II production jet, took off on its first flight Friday, March 4, from Naval Air Station Fort Worth. The JointAF-7, the second F-35 Lightning II production jet, took off on its first flight Friday, March 4, from Naval Air Station Fort Worth Joint Reserve Base. The F-35A conventional takeoff and landing variant flew for 1.3 hours. AF-7 is the second and final aircraft from Low Rate Initial Production lot 1. The first, AF-6, flew for the first time a week earlier. The two production jets and eleven preproduction F-35 test aircraft have completed 683 flights since testing began in December 2006.
The F-35A conventional takeoff and landing variant flew for 1.3 hours. AF-7 is the second and final aircraft from Low Rate Initial Production lot 1. The first, AF-6, flew for the first time a week earlier. The two production jets and eleven preproduction F-35 test aircraft have completed 683 flights
Latest from Aerospace Manufacturing and Design
- Pivotal achieves AS9100D certification
- CMMs for large-scale, heavy-duty measurement
- #80 Manufacturing Matters - Machining Strategies to Save Time and Improve your Process for MedTech Components with Kennametal Inc.
- Experts discuss the latest in toolholding technology
- Forecasting the year ahead in design and manufacturing
- GE Aerospace, Lockheed Martin demonstrate rotating detonation ramjet
- Stainless steel quick release ball lock pins
- Toray Advanced Composites, partners win JEC Innovation Award for Circularity & Recycling